Project details

Working alongside our client VINCI , we have been appointed for the groundworks, hard landscaping and externals packages on this new scheme. The new bus interchange will ultimately enhance connectivity between different modes of transport and provide a substantial upgrade in current facilities. By improving access to jobs, learning and leisure, the new interchange will support Vision Tameside – building greater economic prosperity and transforming learning and skills

Scope of works

Remediation

  • Removal of existing foundations
  • Soil testing

Drainage

  • Existing sewer diversion works, (adoptable by United Utilities)
  • External drainage, concrete and clay pipe, Gatic Slotdrain, Beany Kerbs, and Channel Drainage.
  • 12m length oil interceptor 6m deep,
  • Attenuation Tank using Pluvial Cube Module unite to gain 80m3 of surface water storage

Sub Structure

  • Foundations bases, ground beams and concrete slabs constructed over 12 different levels.
  • 4No independent Bus Shelter either side of the Metrolink.
  • 6 No Precast DIRO bay, to protect the building from
  • Precast Boundary Wall unit bases
  • Rhinoguard Bollard Foundations

Hard Landscaping

  • Kassel Kerbs installation
  • New road construction tie in
  • Ornate seating installation
  • Signage foundation
  • 58No Lighting Columns foundation
  • Visi-rail Foundations
  • Prep and installation of 3000m2 of Granite Paving
  • Street furniture

Services

  • EWN diversion works
  • UTC diversion ducting works
  • 3000m of ducting installation & duct chamber
  • Cubis Chamber for Metrolink Services
  • CCTV ducting and bases