Project details

This scheme of 17 spacious four-bedroom bespoke homes in the desirable suburb of Prestwich is being developed on a parcel of land formerly belonging to Prestwich Golf Club. Chartrange has been awarded the remediation, roads and sewers and groundwork packages by housing developer, Mulbury Homes.

Scope of works

 

Remediation

Felling of Trees / clearance of brash and bushes

Strip of Top Soil to stockpile (future use suitability testing by others)
Turn over of Made Ground
Inversion of Contamination Hot Spots

Inversion on site of invasive weeds / Plants

Import subsoil for capping of gardens and POS

Capping of plots with 6F2 (plus 2m offset)

CBR Testing – road boxes and piling mats

Site Trim

Site Drainage

Storm water drainage Road 1 – 68.5m

Storm water outfall – 56.4m

Foul water outfall – 44.5m

Storm water manhole 4no

Foul water manhole 3no

Surface water demarcation manhole 4no

Foul water demarcation manhole 3no

Road Build Up

Temporary kerb line construction – 190m

Road Capping with (350mm Type 1 sub base lime stone)

Base course  tarmac  (100mm AC32 dense base) – 915m2

Groundwork’s

Plot Foundations, services, drainage, plot drives, flagging and externals