<?xml version="1.0" encoding="UTF-8"?><!-- generator="WordPress/2.9.1" -->
<rss version="0.92">
<channel>
	<title>Chartrange Group &#187; Latest Projects</title>
	<link>http://chartrange.com</link>
	<description></description>
	<lastBuildDate>Fri, 06 May 2011 15:49:56 +0000</lastBuildDate>
	<docs>http://backend.userland.com/rss092</docs>
	<language>en</language>
	<meta xmlns="http://www.w3.org/1999/xhtml" name="robots" content="noindex,follow" />

	<item>
		<title>Chartrange gains ISO9001 accreditation</title>
		<description><![CDATA[Chartrange Ltd is proud to have gained certification for its ISO 9001 Management System. To achieve this, our company has undergone a rigorous assessment of its processes and procedures to demonstrate compliance with ISO 9001 requirements.   
 ISO 9001 is an internationally recognised quality standard that specifies the requirements for controlling the quality of products and [...]]]></description>
		<link>http://chartrange.com/chartrange-gains-iso9001-accreditation</link>
			</item>
	<item>
		<title>Tesco &#8211; Remediation, Earthworks &amp; Infrastructure</title>
		<description><![CDATA[This project is still in progress and involves the remediation of a former industrial site. It will be completed within a challenging timeframe and on a spatially restricted area. Our contribution will centre on the completion...]]></description>
		<link>http://chartrange.com/davyhulme-school-test-project</link>
			</item>
	<item>
		<title>Co-operative Headquarters &#8211; Bulk Earthworks</title>
		<description><![CDATA[Client: Bam Construction
Our contribution to the most prestigious project in Manchester in 2010 was the mass excavation and disposal of some 50,000m3 of alluvial deposits which was completed in traffic sensitive and built up city centre location without disruption. We have further minimised environmental impact by re-engineering materials on-site use and for export of materials [...]]]></description>
		<link>http://chartrange.com/co-operative-headquarters-bulk-earthworks</link>
			</item>
	<item>
		<title>NEC Engineering Works &#8211; Remediation</title>
		<description><![CDATA[Client: Taylor Woodrow on behalf of TESCO
The former site use was the NEC engineering works, the developable site area equated to 160 acres and was remediated in line with the environmental remediation strategy that had been developed in order to redevelop the site for its proposed end use being a TESCO distribution centre.
Historic demolition had [...]]]></description>
		<link>http://chartrange.com/tesco-test-project-duckingfield</link>
			</item>
	<item>
		<title>Origin, Whitworth Street, Manchester</title>
		<description><![CDATA[
Client: West Developments
Project duration was 6 weeks.
Scope of works:
A confined 40,000m3, 14m deep bulk excavation below frames and disposal off site in a busy inner city area.
]]></description>
		<link>http://chartrange.com/origin-whitworth-street-manchester</link>
			</item>
	<item>
		<title>St Damian&#8217;s School &amp; New Charter Academy</title>
		<description><![CDATA[Client: Carillion / Ashton-Under-Lyne
Project duration was 60 weeks.
Scope of works:
Provide all in the groundworks services including, 150,000m3 cut and fill, piling platforms, and the provision of access and haul roads, management and eradication of invasive plant species, highways and enabling works, underground drainage systems, storage tanks, retaining walls, concrete substructure works, kerbing and exterior and [...]]]></description>
		<link>http://chartrange.com/st-damians-school-new-charter-academy-ashton-under-lyne</link>
			</item>
	<item>
		<title>Heywood Sports &amp; Leisure Village, Heywood</title>
		<description><![CDATA[Client: Kier North West
Project duration was 3 weeks.
Scope of works:
Reduce level dig and provision of specially engineered and suspended piling platform in difficult ground conditions.
]]></description>
		<link>http://chartrange.com/heywood-sports-leisure-village-heywood</link>
			</item>
	<item>
		<title>Tesco, Gorton &#8211; Manchester</title>
		<description><![CDATA[Client: Taylor Woodrow Construction
Project duration was 48 weeks.
Scope of works:
Provide all in the ground services in a short time frame. This included a cut and fill, piling platforms, provision of access and haul roads, management and eradication of invasive plant species, highways and enabling works, underground drainage systems, retaining walls, concrete substructure works, kerbing and [...]]]></description>
		<link>http://chartrange.com/tesco-gorton-manchester</link>
			</item>
	<item>
		<title>Tesco, Cheetham Hill, Manchester</title>
		<description><![CDATA[Client: Taylor Woodrow Construction
Project duration was 40 weeks.
Scope of works:
Tesco’s first ‘ALL GREEN’ store in a culturally sensitive context where we provided a reduce level dig, cut and fill, provision of piling mat and eradication of invasive plant species.
]]></description>
		<link>http://chartrange.com/tesco-cheetham-hill-manchester</link>
			</item>
	<item>
		<title>Plot T, Kingsway Business Park, Rochdale</title>
		<description><![CDATA[Client: Wilson and Bowden
Project duration was 7 weeks.
Scope of works:
A 100,000m3 bulk muck shift involving the excavation and disposal off site of up to 4000m3 a day.